Electrical checklist for new home construction

Rough-in, panel size, and lighting layout belong in the plan before drywall. A Lakes Region build gets one clean chance to get those right.

Lock the panel and service size early

Heat, well, EV charging, and a future standby generator all belong in the load calculation before the service is set. Undersizing a new Lakes Region home to save a day at the start is expensive later. 200-amp is common when the plan is honest about those loads. See what a 200-amp service covers if you are comparing options.

Rough-in every circuit you will regret missing

Smoke and CO locations, exterior receptacles, garage and basement runs, data pathways you want stubbed, and lighting layouts should be marked before insulation. Moving a can light after sheetrock is a patch job. Lighting layout is part of how we plan a new build with you or your GC.

Trim, devices, and inspection close the loop

After drywall, trim sets devices, covers, and final connections for inspection. Seasonal access and weather still matter on lake lots. A written estimate covers rough-in through trim for the scope you approved.

This page is for education only. It is not a quote, a rate card, a diagnosis, or an inspection of a specific house. Request a written estimate for the plan that fits your project.

New home framing ready for electrical rough-in

Questions

New home electrical questions for the Lakes Region

When do you need plans from us?

Before rough-in. Floor plans with appliance and lighting intent are enough to start a load calculation and a written estimate.

Do you work with the builder's schedule?

Yes. Rough-in and trim are scheduled against the build calendar, including seasonal lake lots when access is limited.

Should every new home get a generator stub?

Not required, but planning a pad location and a clear path to the panel during construction is far easier than cutting finished work later.

Is low-voltage wiring part of the electrical bid?

Data, camera, and audio pathways can be stubbed when you ask for them in the estimate. Scope them in writing so nothing is assumed.

Is this checklist a construction contract?

No. It is education for planning. The written estimate is the scope we build to.

Free Estimates

Ready for electrical work done right?

Tell us about your project. Fair estimate, workmanship guaranteed for life.

Seal: lifetime craftsmanship guarantee on every job LIFETIME GUARANTEE ON EVERY JOB

Workmanship and installation

Shield: veteran-owned, with discounts for those who serve VETERAN OWNED U.S.A.

Discounts for those who serve

Plate: New Hampshire licensed master electrician, fully insured NEW HAMPSHIRE LICENSED INSURED #15597

Coverage above the standard

Plate: 5.0 star Google average 5.0 GOOGLE RATED

Five-star Google rated